T-28 Dave Platt
#876
Chic,
Thanks, Not sure about battery placement yet, working on installing the onboard glow, as soon as I figure that out I'll decide on battery placement.
More pix later today.
Larry
Thanks, Not sure about battery placement yet, working on installing the onboard glow, as soon as I figure that out I'll decide on battery placement.
More pix later today.
Larry
#880
Boyd,
I think I understand now... a bit slow.... I had the inst panel laser cut by Chad and the inst are from IFLYTALLIES.
Now for the important stuff.... Houston I think I have a problem...HELP!!!
As you can see from the pix the back of the wing that the dive brake is part of is about 3/32" high... can't figure out what happened and any ideas if I need to be worried about it or how to fix????
Thanks
Larry
#885
Okay guys,
Got the back of air back frame sanded to meet fuse, it's still off about 1/64th but I'm done.
Attached is a pix of all the components in position, still need to order another micro servo for the air valve and Vinyl Decals...getting close.
Hoping to run air lines and electric wires in wing this afternoon....
Larry
#886
Gear down
Gear up
Okay wiring done for the gear lights, they actually look awesome.
Started running airlines but ran out of retainers, ordered them yesterday and with any luck will be here Wednesday.
Hoping to break in engine before Thanksgiving
#891
Thanks Boyd,
Now running servo wires in wing and trying to figure out where to put the receiver.
Next is seeing how the servo wires from the wing sit to the fuselage and then mount the dual fuel tanks, engine and throttle servo
Hopefully engine break in right after Turkey day
Thanks guys for sticking with me through this longgg journey.
Larry
Now running servo wires in wing and trying to figure out where to put the receiver.
Next is seeing how the servo wires from the wing sit to the fuselage and then mount the dual fuel tanks, engine and throttle servo
Hopefully engine break in right after Turkey day
Thanks guys for sticking with me through this longgg journey.
Larry
#893
Boyd,
Thanks. You had sent me the entire build on a CD many moons ago.
I got the air brake to sit better, will post some pix as soon as I finish with the wing servos
Thanks again
Larry
Thanks. You had sent me the entire build on a CD many moons ago.
I got the air brake to sit better, will post some pix as soon as I finish with the wing servos
Thanks again
Larry
#895
Okay guys update time
So I got the tail feather attached finally, along with the dual fuel tanks and engine. Trying to figure out location of mini servo for throttle, stay tuned
So I got the tail feather attached finally, along with the dual fuel tanks and engine. Trying to figure out location of mini servo for throttle, stay tuned
#898
Okay guys,
Getting closer, here's a shot of the wiring, recv, onboard glow and air lines.
Talk about 5lbs of ,,,, in a 2lb bag, hope to check wing seating this afternoon or tomorrow AM depending on garage temp
Larry
Getting closer, here's a shot of the wiring, recv, onboard glow and air lines.
Talk about 5lbs of ,,,, in a 2lb bag, hope to check wing seating this afternoon or tomorrow AM depending on garage temp
Larry
#900
Okay guys,
Here is my attempt at the lower main door closure method, waiting for epoxy to really setup before trying.
Working on nose gear doors and hopefully be done with them this week..... nothing moving quickly
Larry
hoping this works
2-56 rod
Here is my attempt at the lower main door closure method, waiting for epoxy to really setup before trying.
Working on nose gear doors and hopefully be done with them this week..... nothing moving quickly
Larry
hoping this works
2-56 rod